Back to browse
WA Solicitation Total Small Business

4730 EXPANSION JOINT

Department of Defense — Department of the Navy

Solicitation Number N0040626Q0289
Posted Date Jun 30, 2026
Due Date Jul 8, 2026
Estimated Value Not specified
NAICS Codes 332996
Place of Performance Not specified

Description

Fleet Logistics Center Puget Sound (FLCPS) intends to solicit for EXPANSION JOINT supplies: EXPANSION JOINT - 10”X8”, CONC EXP,JOINT - 150# 6” F/F, BUTYL/NYLON, SIM TO FLEXICRAFT ASA B16.5 DRILLING, VLV RELIEF - 6 X 8 , RELIEF VLV, 150# RF FLANGE, Q SIZE ORIFICE, ASTM A216 GR WCB, FORGED STEEL, SIM TO MODEL LESER TYPE 526, SET @75 PSIG, ELBOW, 8”, ELBOW - 90 DEG, SR, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, ELBOW, 8”, ELBOW - 90 DEG, LR, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, TEE - 8”X8”X6”, RED, TEE, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, FLANGE - 8”, FLANGE SLIP-ON, 150# FLAT FACE, ASTM A234 WPB, ASA B16.5, C-STEEL, FLANGE - 8”, FLANGE SLIP-ON, 150# RAISE FACE, ASTM A234 WPB,ASA B16.5,C-STEEL, TEE, FLANGE - 8”, TEE, FLANGED 150#, ASTM A536, DUCTILE IRON, SIM TO SMITH COOPER, PIPE NIPPLE - 3/4" , PIPE NIPPLE, 4" LONG, TBE, STEEL, SCH 80, PIPE CAP, THREADED, 3/4" , PIPE CAP,THREADED - ASTM-A105, FORGE STEEL, FLANGE - 6”,FLANGE,SLIP-ON,150#, RAISED FACE, ASTM A234, C-STEEL, ELBOW - 3/4", ELBOW, 90DEG FPT, ASTM A105, C-STEEL, BOSS, 1/4", BOSS - ASTM-A105, C-STEEL, NIPPLE, THREADED ONE - 1/4", NIPPLE,THREADED ONE END, ASTM-A106, C-STEEL, 4”LONG,SCH 80, UNIVERSAL JOINT, 1 3/4" OD X 1" ID S.S, UNIVERSAL JOINT - CRES, UNION, 1/4 " OD, UNION - 316 CRES, SWAGELOK COMPRESSION FITTING, CONNECTOR - 1/4 MPT X 1/4 OD TUBE ADAPTER, ELBOW - 8”, ELBOW, 45 DEG, LR, BUTTWELD, SCH 40,ASTM A234 WPB, ASA B16.9, C-STEEL, TEE, BUTTWELD - 8”, TEE, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9,C-STEEL. — All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. — Quotes will be evaluated in accordance with RFO 12.203, the Government will select the most advantageous offer based on the following evaluation factors: technical including delivery date, price, and past performance in no order of relative importance. — Anticipated Award Date: July 2026 — Contracting Officer: Lorraine Small / Lorraine.m.small.civ@us.navy.mil

Fleet Logistics Center Puget Sound (FLCPS) intends to solicit for EXPANSION JOINT supplies: EXPANSION JOINT - 10”X8”, CONC EXP,JOINT - 150# 6” F/F, BUTYL/NYLON, SIM TO FLEXICRAFT ASA B16.5 DRILLING, VLV RELIEF - 6 X 8 , RELIEF VLV, 150# RF FLANGE, Q SIZE ORIFICE, ASTM A216 GR WCB, FORGED STEEL, SIM TO MODEL LESER TYPE 526, SET @75 PSIG, ELBOW, 8”, ELBOW - 90 DEG, SR, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, ELBOW, 8”, ELBOW - 90 DEG, LR, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, TEE - 8”X8”X6”, RED, TEE, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9, C-STEEL, FLANGE - 8”, FLANGE SLIP-ON, 150# FLAT FACE, ASTM A234 WPB, ASA B16.5, C-STEEL, FLANGE - 8”, FLANGE SLIP-ON, 150# RAISE FACE, ASTM A234 WPB,ASA B16.5,C-STEEL, TEE, FLANGE - 8”, TEE, FLANGED 150#, ASTM A536, DUCTILE IRON, SIM TO SMITH COOPER, PIPE NIPPLE - 3/4" , PIPE NIPPLE, 4" LONG, TBE, STEEL, SCH 80, PIPE CAP, THREADED, 3/4" , PIPE CAP,THREADED - ASTM-A105, FORGE STEEL, FLANGE - 6”,FLANGE,SLIP-ON,150#, RAISED FACE, ASTM A234, C-STEEL, ELBOW - 3/4", ELBOW, 90DEG FPT, ASTM A105, C-STEEL, BOSS, 1/4", BOSS - ASTM-A105, C-STEEL, NIPPLE, THREADED ONE - 1/4", NIPPLE,THREADED ONE END, ASTM-A106, C-STEEL, 4”LONG,SCH 80, UNIVERSAL JOINT, 1 3/4" OD X 1" ID S.S, UNIVERSAL JOINT - CRES, UNION, 1/4 " OD, UNION - 316 CRES, SWAGELOK COMPRESSION FITTING, CONNECTOR - 1/4 MPT X 1/4 OD TUBE ADAPTER, ELBOW - 8”, ELBOW, 45 DEG, LR, BUTTWELD, SCH 40,ASTM A234 WPB, ASA B16.9, C-STEEL, TEE, BUTTWELD - 8”, TEE, BUTTWELD, SCH 40, ASTM A234 WPB, ASA B16.9,C-STEEL. — All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. — Quotes will be evaluated in accordance with RFO 12.203, the Government will select the most advantageous offer based on the following evaluation factors: technical including delivery date, price, and past performance in no order of relative importance. — Anticipated Award Date: July 2026 — Contracting Officer: Lorraine Small / Lorraine.m.small.civ@us.navy.mil

Create a free account to read the full description

Sign up to access complete RFP details, match scores, and more.

Create Free Account