MAINT & Repair/Replace Letterkenny
Department of Defense — Department of the Army
Description
Amendment 01 dated 13 July 2026 - See pictures in the attachments. The quote due date has changed to 20 July 2026. — The POC to coordinate a site visit is Michael Hershey at michael.b.hershey.civ@army.mil or phone at 717-267-8258. — The U.S. Army TMDE Activity (USATA) has a requirement to procure maintenance and repair/replace of its laboratory environment systems located at its TMDE Support Center, Letterkenny Army Depot, 5240 Technology Avenue, Chambersburg, PA 17201. The maintenance and repair/replace shall include the following specifications or equivalent (if not brand name): — Replace (4) Units in Lab, Including: — • (4) Replacement Evaporators on Existing Indoor Units (Metal structure to remain - replacing internal components) — • (4) Replacement Condensing Units — • Replace Rooftop units via crane — • Remove existing Temp/Humidity Controller for each of the four (4) labs and replace with PLC Controller — • PLC controller to be housed in a new 24x24 NEMA Enclosure — • Provide a new stand along PC with VT SCADA to monitor, trend and store all data — • Program PLC's to match existing HVAC controls — • Install new control panels and interface to existing equipment — • Startup/Training of new control system — Place of Contract Performance: Chambersburg, PA 17201
Amendment 01 dated 13 July 2026 - See pictures in the attachments. The quote due date has changed to 20 July 2026. — The POC to coordinate a site visit is Michael Hershey at michael.b.hershey.civ@army.mil or phone at 717-267-8258. — The U.S. Army TMDE Activity (USATA) has a requirement to procure maintenance and repair/replace of its laboratory environment systems located at its TMDE Support Center, Letterkenny Army Depot, 5240 Technology Avenue, Chambersburg, PA 17201. The maintenance and repair/replace shall include the following specifications or equivalent (if not brand name): — Replace (4) Units in Lab, Including: — • (4) Replacement Evaporators on Existing Indoor Units (Metal structure to remain - replacing internal components) — • (4) Replacement Condensing Units — • Replace Rooftop units via crane — • Remove existing Temp/Humidity Controller for each of the four (4) labs and replace with PLC Controller — • PLC controller to be housed in a new 24x24 NEMA Enclosure — • Provide a new stand along PC with VT SCADA to monitor, trend and store all data — • Program PLC's to match existing HVAC controls — • Install new control panels and interface to existing equipment — • Startup/Training of new control system — Place of Contract Performance: Chambersburg, PA 17201
Create a free account to read the full description
Sign up to access complete RFP details, match scores, and more.
Create Free AccountInterested in this opportunity?
Create a free account to view the full description, get match scores, and save this RFP to your pipeline.
View Full Details See pricing plansSource
SAM.gov