Cripple Creek Veg Management Roads Reconstruction — CHUGACH NF — This project includes subgrade construction, unsuitable material excavation and — endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing — and grubbing,disposal site contouring, switchback realignment, waterbar construction — and reconstruction,and all other work required to get these roads to a condition to — place aggregate surface materials. Option item is road surfacing. — Questions Due:11/20 — Proposals due: 12/04/2026 1700 PT — Amendment POSTED 11/23/2026 with Q&A
Cripple Creek Veg Management Roads Reconstruction — CHUGACH NF — This project includes subgrade construction, unsuitable material excavation and — endhaul,aggregate placement for subgrade reinforcement, aggregate surfacing, clearing — and grubbing,disposal site contouring, switchback realignment, waterbar construction — and reconstruction,and all other work required to get these roads to a condition to — place aggregate surface materials. Option item is road surfacing. — Questions Due:11/20 — Proposals due: 12/04/2026 1700 PT — Amendment POSTED 11/23/2026 with Q&A