Back to browse
PA Solicitation

AMR, Kimber Mtn NW, Broad Top Twp, Bedford Cnty

Department of Environmental Protection

Solicitation Number OSM 05(2002,7054)101.1
Posted Date May 22, 2026
Due Date Jun 18, 2026
Estimated Value Not specified
NAICS Codes
Place of Performance Not specified

Description

The Principal Items Of Work And Approximate Quantities Are Implementation Of The Erosion And Sediment Pollution Control Plan Rock Construction Entrance 4 Each Implementation Of The Erosion And Sediment Pollution Control Plan Compost Filter Sock 32 Diameter 17 674 L F Implementation Of The Erosion And Sediment Pollution Control Plan Riprap Apron 89 S Y Clearing And Grubbing Grading Area 1 79 0 Acre Clearing And Grubbing Grading Area 2 17 2 Acre Clearing And Grubbing Grading Area 3 7 4 Acre Clearing And Grubbing Grading Area 4 1 9 Acre Clearing And Grubbing Grading Area 5 35 6 Acre Clearing And Grubbing Grading Area 6 7 5 Acre Access Road New Road Construction 1 826 L F Access Road Install Two Inch 2 Penndot 2A On All Roads At End Of Project 2 229 Ton Subsurface Drain 3 844 L F Dewatering Impoundments 1 L S Grading Grading Area 1 1 133 874 C Y Grading Grading Area 2 114 232 C Y Grading Grading Area 3 33 166 C Y Grading Grading Area 4 8 618 C Y Grading Grading Area 5 490 907 C Y Grading Grading Area 6 68 351 C Y Permanent Channel Excavation 360 C Y Rock Lining 2 436 S Y Seeding Seed Bed Preparation 148 6 Acre Seeding Seed 6 241 Lb Woodrat Mitigation Structures 9 Each Beginning On The Issue Date Free Copies Of Bid Documents Can Be Obtained By Going To Www Bidexpress Com Pa Department Of Environmental Protection Mandatory Pre Bid Conference Is Scheduled For June 1 2026 At 9 A M Representatives From The Department Will Meet The Contractors At 40 07 23 19 N 78 14 20 28 W Failure To Attend The Pre Bid Conference Will Be Cause For Rejection Of The Bid

The Principal Items Of Work And Approximate Quantities Are Implementation Of The Erosion And Sediment Pollution Control Plan Rock Construction Entrance 4 Each Implementation Of The Erosion And Sediment Pollution Control Plan Compost Filter Sock 32 Diameter 17 674 L F Implementation Of The Erosion And Sediment Pollution Control Plan Riprap Apron 89 S Y Clearing And Grubbing Grading Area 1 79 0 Acre Clearing And Grubbing Grading Area 2 17 2 Acre Clearing And Grubbing Grading Area 3 7 4 Acre Clearing And Grubbing Grading Area 4 1 9 Acre Clearing And Grubbing Grading Area 5 35 6 Acre Clearing And Grubbing Grading Area 6 7 5 Acre Access Road New Road Construction 1 826 L F Access Road Install Two Inch 2 Penndot 2A On All Roads At End Of Project 2 229 Ton Subsurface Drain 3 844 L F Dewatering Impoundments 1 L S Grading Grading Area 1 1 133 874 C Y Grading Grading Area 2 114 232 C Y Grading Grading Area 3 33 166 C Y Grading Grading Area 4 8 618 C Y Grading Grading Area 5 490 907 C Y Grading Grading Area 6 68 351 C Y Permanent Channel Excavation 360 C Y Rock Lining 2 436 S Y Seeding Seed Bed Preparation 148 6 Acre Seeding Seed 6 241 Lb Woodrat Mitigation Structures 9 Each Beginning On The Issue Date Free Copies Of Bid Documents Can Be Obtained By Going To Www Bidexpress Com Pa Department Of Environmental Protection Mandatory Pre Bid Conference Is Scheduled For June 1 2026 At 9 A M Representatives From The Department Will Meet The Contractors At 40 07 23 19 N 78 14 20 28 W Failure To Attend The Pre Bid Conference Will Be Cause For Rejection Of The Bid

Create a free account to read the full description

Sign up to access complete RFP details, AI match scores, and more.

Create Free Account