Project includes demolition of an existing septic system and replacement with a septic mound system. This is a rebid due to issues with the pump sizing in the previous design. Please see the plans and bid package as noted below. Bid Closing Date and Time: 9/10/2026 at 3:00 PM. Bids must be submitted electronically as directed in the General Information and Instructions to Bidders.
Project includes demolition of an existing septic system and replacement with a septic mound system. This is a rebid due to issues with the pump sizing in the previous design. Please see the plans and bid package as noted below. Bid Closing Date and Time: 9/10/2026 at 3:00 PM. Bids must be submitted electronically as directed in the General Information and Instructions to Bidders.